Specify node map or node pool or resource pool constraints.
The configuration file allows you to set up pools of related nodes or
resources. The Advanced tab allows you to limit execution of a stage to a
particular node or resource pool. You can also use a map to specify a group of
nodes that execution will be limited to just in this stage. Supply details as
follows:
Node pool and resource constraints. Specify constraints in
the grid. Select Node pool or Resource pool from the Constraint drop-down list.
Select a Type for a resource pool and, finally, select the name of the pool you
are limiting execution to. You can select multiple node or resource pools. This
is only enabled if you have defined multiple pools in the configuration file.
Node map constraints. Select the option box and type in the
nodes to which execution will be limited in the text box. You can also browse
through the available nodes to add to the text box. Using this feature
conceptually sets up an additional node pool which does not appear in the
configuration file.
The lists of available nodes, available node pools, and
available resource pools are derived from the configuration file.
Source: IBM